Turnkey EPC Solutions: How Single-Point Accountability Reduces Capital Project Risk 

11 minutes ago
5 min read
Turnkey EPC Solutions

If construction is put on hold due to a late design change, the project owners need a solution, and not a debate about who is to blame. The true challenge for capital project leaders is to link engineering decisions, equipment deliveries, site implementation, and readiness for operations.


One way to overcome this challenge is to implement turnkey EPC solutions that focus on the contractual responsibility within a clearly defined delivery scope. But this model does not make a viable risk management tool until it has clear requirements, realistic timelines and owner oversight.


The Cost of Fragmented Accountability


The statistics of the performance of capital projects are depressing. Widely cited industry research finds that large capital projects typically take about 20% longer to finish than scheduled and run up to 80% over budget. Academic studies of megaprojects extend this research, revealing that about 90% of megaprojects are overspending, overscheduled, or both.


In the meantime, the expectations to perform are growing. In 2024, the International Energy Agency estimated global investment in clean energy to be approximately $2 trillion, which is approximately twice that of investment in fossil fuels. The engineers, equipment spaces, and talent pool are shared among wind, solar, storage, grid, and data center projects. In this setting, schedule slippage is even more expensive, and the owner, who is responsible for multiple contractors, is on the hook for most of it.


What “Single-Point Accountability” Actually Means

What “Single-Point Accountability” Actually Means


With a multi-contract approach, the owner often has separate contracts with a design company, equipment suppliers, and one or more construction contractors. If there's a change of design that leads to a change in procurement, each party can honestly point the finger at the other. The owner becomes an arbitrator and is typically responsible for the payment.

 

Turnkey is when the entire facility is handed over to the customer to complete and ready for operation on specified terms of performance, cost, and schedule. There are three practical implications:

 

  • The interface risk is transferred to the contractor. The responsibility for coordinating disciplines is shifted from owner to contractor.

  • Design and construction are combined. Constructability is addressed in the design phase, not found on-site.

  • The terms of business are more straight-forward. A lump sum or capped price option will provide the sponsor with greater cost certainty at financial close.

 

This does not imply that the owner withdraws. It involves taking on the role of a coordinator and becoming a governor (establishing the standards, checking the process, and safeguarding the project's concerns).


Where Turnkey Delivery Can Go Wrong


The turnkey EPC solution is not an assurance against risk. Owners must be realistic in identifying potential trouble areas:

 

  1. Vague scope definition. If the front-end definition is light, then the contractor will keep the uncertainty in the definition and will bill it back to the client as a change of order later.

  2. Misaligned incentives. Unless the contract performance guarantees are carefully established, a lump-sum contractor could be tempted to cut corners on the cost to ensure that the product is in operation at the lower cost.

  3. Reduced owner visibility. There are fewer touchpoints for problems to emerge until reporting, and verification is planned from the outset.

  4. Excessive dependence on the contract. A good contract is no substitute for diligent supervision. Even if you win a dispute, it costs you more money.

 

It is here where the measurable value of EPC project management consultants comes into play. Independent advisors assist owners to establish scope, conduct like-for-like bid evaluations, stress test schedules, and track delivery without losing the contractor's single point of responsibility.


Actionable Steps for Owners and Project Sponsors

Actionable Steps for Owners and Project Sponsors


These practices all enhance results, whether it is for a solar portfolio, a processing facility, or a hyperscale campus.

 

  1. Make sure to invest in front end definitions. Carefully consider feasibility, basis of design and risk identification to ensure sufficient time and investment are made prior to tendering. The clearer the scope, the closer the cost certainty will be.


  2. Define a standard set of procedures to address risks and assign risk owners. All material risks, be they geotechnical, equipment lead time or anything else, should be strategically assigned to the party that has the capacity to best manage them. Don't make a "blanket transfer" that will be a "premium" price to contractors.


  3. Make performance commitments reflect business objectives. Provide availability, efficiency or throughput or energy yield guarantees, with meaningful liquidated damages, based on value creation by the asset.


  4. Develop governance momentum. Progress is reviewed weekly; costs and schedules are independently audited, and escalation paths are clearly identified to ensure that surprises are kept to a minimum. Transparent and disciplined reporting is essential for good project management for EPC, not just trust.


Make a long-term plan for handover

  1. Make a long-term plan for handover. Late-stage delay often occurs in the commissioning, training and documentation process. Ensure they are incorporated into the schedule and acceptance criteria from the beginning.


  2. Consider life cycle thinking. A successful EPC project lifecycle management process starts at the concept and feasibility stage, progresses to detailed design, procurement, construction, commissioning, and moves on to the operational transition phase. Decisions taken in the first 10% of a project's lifecycle determine 80% of the results - that's why lifecycle thinking should start much earlier than the project contract is signed.


Choosing the Right Delivery Model


Turnkey is not a solution for all projects. EPCM or hybrid models are more appropriate for highly novel technologies, where the owner desires to have the utmost control over design details and situations where the scope is not resolved. The question is where you want the risk to be placed and whether the party who will own the risk can afford and have the balance sheet to take the risk.

 

Turnkey EPC solutions may be the most consistent of the two in terms of cost certainty, schedule discipline, and responsibility when the asset type being built is a familiar, repeatable construction like a solar plant, processing unit, substation or a modular data center.


The Bottom Line

The Bottom Line


Under turnkey, the risk associated with the capital project is not wiped off the table; it is brought to the table, identified and controlled. Single-point accountability eliminates the grey areas that can make small problems big, and it provides owners and lenders with the answer to the most critical question in any project: Who is going to bring this about?

 

Add to that careful up-front planning, incentives that align with the work, and an independent review, and your project stands for the best chance of being delivered on time, on budget, and to specification.

 

To have your EPC project handled by the experts, contact Alga Processing LLC for a consultation.


Alga Processing

Alga Processing LLC is an organization that helps your business in operations and management. Its people come from various backgrounds of knowledge and experience that promote a healthy environment for your personnel. Your organization will benefit from ensuring you and your team members are there every day to give the time and talent to yield productivity to its maximum. Contact us for more information on how to help your business grow.

 
 
 

Comments


logo-apllc-right- large size  (1)_edited_edited.png

Copyright by Alga Processing LLC

bottom of page